Description: This report is an Integrated Cleanup Plan (ICP) that assimilates and integrates the four area-based Closure Plans to provide a comprehensive summary of the cleanup efforts planned for the entire Deloro Mine Site (and related offsite areas). In addition to summarizing the area-based plans, the ICP was developed to consider logistics and to capitalize on synergies between the various plans. The ICP includes optimization and prioritization of remedial actions across the affected areas.
Download the file:
Download associated files: