Mine AreaGold mining at the site took place over a period of about 35 years from about 1867 to 1902. Mine shafts were scattered throughout the site. The deepest mine shaft was the Gatling shaft at a depth of approximately152 metres. The ministry located and sealed all major mine shafts, and remediated all other mine features from 1993-1995. The draft proposed cleanup strategy for the mine area deals with remaining waste rock and contaminated soils. ![]() Click for larger image Area: The Main Mine Area - 3 ha
|
|
![]()